30” Potable Water Pipeline Project – Traffic Control Plan, Otay Water District, CA

Sepulveda construction requested to prepare a Traffic Control Plan for the installation of a 30” Potable Water Pipeline for the Otay Water District in the San Diego area.  The water line ran down the southbound lane of Hunte Parkway and through the signalized 6-lane intersection of Proctor Valley Road.  The traffic control was set up in stages to close certain lanes and divert the traffic in the intersection around the construction area, as well as close a portion of Hunte Parkway and detour the local traffic through the side streets.  A detour plan was prepared and detour signs installed during construction. The Traffic Control plans utilized Manual on Uniform Traffic Control (MUTCO) design standards as well as the Work Area Traffic Control Handbook (WATCH).