Rte 405 Sepulveda Pass Design Build Project

405 DBKiewit was the design-builder for the I405 Sepulveda Pass Widening Design Build Project for Metro, a $350 million contract. HNTB served as the designer for Kiewit. Contracted with Kiewit directly as a construction engineering consultant, PacRim provided structural engineering design for the preparation of construction shoring design for several bridge widenings designed by HNTB. The design follows the Caltrans shoring manual and agency review process. In addition, PacRim also provided peer review for two dozen shoring designs done by other Kiewit consultants. The engineering efforts require immediate attention and short turnaround times.