Solar Photovoltaic Systems Project Management and Installation Services, R-10019

PacRim Engineering responded to LAUSD’s goal of installing 24MW system by 2010 and installing 50WM by 2013.  This involved 90 different school sites.  PacRim’s lead the design-build team through the process under the supervision of the prime – project management team.  The project demanded site investigation, structural calculation, structural design, PV design, Electrical design, and installation