Vermont Avenue Bridge over US 101 Improvements

Vermont AvePacRim Engineering is responsible for leading a multiple-disciplinary team to widen the Vermont Avenue Overcrossing Bridge and complete associated interchange improvements. The project is funded by Metro Call-for-Projects and other local funds. The design follows Caltrans Project Development Procedures and Caltrans Bridge Design Manuals. The scope of services of the project includes NEPA and CEQA environmental documents, preparation and approval of Project Report, complete engineering design, and final preparation of Plan, Specifications and Estimates (PS&E). The project requires coordination and approval from Caltrans District 7 and Headquarter, as well as the approval of the City of Los Angeles Bureau of Engineering. The Project is on-going.