The Pier A Pump Station W-028 Rehabilitation Project is part of Port of Long Beach’s efforts to develop and maintain state-of-the-art infrastructure and improve the pump station to make it a safe, modern, and efficient facility. Currently, two of the existing large pumps (36,000 gallons per minute each) are not working so the pump station is not fully operational.
PacRim took on the structural scope of the project which included: seismic evaluation, surge analysis loading, and heavy rail loading for the pump station; replacement of the roof; pump room modifications; wet well modifications; new designs for new generator and fuel tank pad; construction staging plans and specifications.