Ranger Lift Station No. 16 is a sewer pump station located in the frontage road north of Adams Avenue between Ranger Lane and Piccadilly Lane in Huntington Beach, CA. The $1.5 million project consisted of constructing a 20-foot by 24-foot by 18-foot deep concrete box structure that would house two dry pit pumps and other sewer lift station apparatuses in addition to over 100 feet of sewer pipes lines in the vicinity of the station. The scope of work included the abandonment and demolition of the existing sewer pump station; removal of existing electrical panels, conduit, pavement, and surface improvements; installation of new sanitary sewer line; installation of a new sewer lift station and new dry pit submersible pumps; replacement of force main; asphalt paving and removal; and restoration of existing public and private improvements and related appurtenant work.
The Traffic Control Plans utilized Manual on Uniform Traffic Control (MUTCO) design standards as well as the Work Area Traffic Control Handbook (WATCH). As needed through the construction of the project, PacRim staff assisted Sepulveda Construction with shoring designs, evaluation of pump designs, and miscellaneous materials and equipment procurement.