The storm drain and waterline replacement at Bradley Avenue over Pacoima Wash was part of the on-going City of Los Angeles transportation infrastructure improvement program. The project primarily involved the widening of Bradley Avenue roadway over the Pacoima Wash and in its vicinity. Part of the project also involved removing and reconstructing a 36-inch diameter storm pipe and relocation of an 18-inch water main across the wash within the roadway.
PacRim provided comprehensive civil and structural engineering design services for the project. The design followed Caltrans and APWA design standards. Engineering scope included preparation of plans, specification and estimates and construction support services. The project was delivered on schedule.